Leaderboards.
The Loftwah projects making moves, ranked over the same complete days.
The drop in open issues: closures minus new and reopened issues. A negative number means the list grew. Movement compares with the previous 90 days when both periods are complete.
- 01-3
Liferaft
Same rank
- 02-26
Bubbles
Down 1 place
- 03-28
Protocol 11
Down 2 places
- 04-30
Asset Hunter
Down 3 places
- 05-34
Woodhouse
Down 4 places
- 06-36
Foilbury
Down 5 places
- 07-67
SHOALSHOT
Down 6 places
- 08-75
LoftwahFM
Down 7 places
- 09-77
Fighter
Down 8 places
- 10-128
App Composer
Down 9 places
GitHub activity includes bots. A merged change or closed issue doesn’t tell you how good a product is. A dash means the history couldn’t be fully read, so that project has no rank. This shows recorded issue movement; transfers and deletions aren’t reconstructed.
The whole picture
Fewer open issues · all projects
-504Across the selected period, in blocks of up to seven days.
Above zero: fewer open issues. Below zero: more.
Notes
What the numbers mean
PRs merged counts pull requests by their merge date, including bots. It excludes direct integrations and does not establish production deployment or verified feature delivery. Those outcomes are not measured by this report. Issues closed counts closure events, including an issue closed again after reopening. Issues opened excludes pull requests. Fewer open issues is closures minus new and reopened issues; negative numbers mean growth. Transfers and deleted records cannot be reconstructed from this history, so this is recorded movement rather than an audited historical inventory. A high count doesn't mean a better project.
Ranks use equal complete UTC periods. Equal values share a rank; the next rank skips those places. Movement compares ranks against the previous 90 days and appears only when every project has both periods. Zero is a measured zero. A dash means the history could not be completely read; it earns no rank.
Where the report comes from
GitHub is read on the server for eight explicitly selected projects. Only daily counts and approved project identities are saved. Issue titles, bodies, authors, branches and private links never enter this public report. Collection runs daily through the existing hourly refresh. Today’s unfinished day is excluded; the open-issue count is the count at collection time.
Saved report: ace4797831a1b83df56c78b0. Collected . Old saved links retain their figures. A later refresh cannot change them.


