Factory snapshot · 28 September 2026

Eight public-safe project summaries supplied for the Woodhouse launch.

Source-backed review
Source
The shareable factory SITREP supplied for the Woodhouse launch.
Records
8 public project statuses

Project states at this review.

Each row belongs to this dated snapshot. A later status does not rewrite this archive.

2026-09-28

bubbles: Final convergence

Mechanically and functionally very mature. The current convergence order places Bubbles closest to its stated finish line.

Next proof: Finish connected-product polish, complete a clean browser qualification and secure owner acceptance.

Final convergenceRead status
2026-09-28

fighter: A+ convergence

Functional maturity is very high. The reported remaining work is whole-game quality convergence, not a greenfield prototype.

Next proof: Keep reconciling the complete product against the A+ bar and qualify the exact current release state.

A+ convergenceRead status
2026-09-28

shoalshot: Release convergence

Functionally mature and increasingly polished. The supplied report calls for another clean production qualification and promotion pass.

Next proof: Obtain a valid qualification window, qualify the exact candidate, then verify the same state in production.

Release convergenceRead status
2026-09-28

protocol-11: Qualification and tracker reconciliation

The supplied report points to qualification and tracker reconciliation as the main unresolved work.

Next proof: Resolve the tracker contradictions, refresh the project record and qualify the actual current build.

Qualification and tracker reconciliationRead status
2026-09-28

max: Physical proof required

Software capability is advancing. The actual Pi, walker and real-world FIND experience remain the defining reality check.

Next proof: Build and qualify the real Pi and walker path with the actual microphone, speaker, lights and human use.

Physical proof requiredRead status
2026-09-28

pirates: Gate B locked

Deep in archaeology and parity work. The original game must pass its gate before procedural or endless expansion begins.

Next proof: Complete the missing archaeology families and integrated parity before opening the expansion path.

Gate B lockedRead status
2026-09-28

loftwahfm: Parked against the larger roadmap

The supplied report describes the expanded business-music roadmap as parked, with little recent application movement.

Next proof: Make an explicit decision to resume a bounded roadmap slice or keep the broader venue programme parked.

Parked against the larger roadmapRead status
2026-09-28

social-club: Parked

The larger visual redesign is parked in the supplied report.

Next proof: Resume the premium private-club, hospitality and editorial design pass when the project is active again.