Factory snapshot · 7 October 2026

Nine project summaries refreshed from the supplied portfolio report. Historical snapshots and their review dates remain in the archive.

Source-backed review
Source
The project portfolio report supplied by the operator on 7 October 2026, edited for public publication. Repository and production observations are reported by that source; this publication did not independently rerun the other projects.
Records
9 public project statuses

Project states at this review.

Each row belongs to this dated snapshot. A later status does not rewrite this archive.

2026-10-07

bubbles: Mature · release proof to renew

Recent work resolves zoom, route and test-harness defects. The arcade product is close to its quality bar, but the reviewed source is newer than the latest exact production receipt in the report.

Next proof: Renew exact production evidence and finish whole-product interaction, accessibility and visual acceptance.

Mature · release proof to renewRead status
2026-10-07

fighter: Functional · product convergence

Playing real battles led to changes in the Battle presentation model. Persistence and infrastructure work now carries stronger gates, and layout measurements protect observed player behaviour.

Next proof: Finish whole-game and sharing journeys, show the current source running in production, and keep architecture changes tied to real failures.

Functional · product convergenceRead status
2026-10-07

shoalshot: Production held at the proven release

A clean release qualification established a strong production build. Later first-catch Field Note work added specimen art, a note and a diary handoff, then exposed recovery and browser failures. The report says those newer changes have deliberately stayed out of production.

Next proof: Resolve the first-discovery reveal and its exit paths; decide whether automatic fire should interrupt play; qualify the integrated result before release.

Production held at the proven releaseRead status
2026-10-07

protocol-11: Production verified in the report

The twelve-stage House Circuit, solo undo and restart, stable theme geometry, distinct room and cast artwork, and new sound work have shipped. The supplied report records the reviewed head matching the active production release, with deployed asset hashes, readiness checks and live browser gameplay evidence.

Next proof: Physical iPhone acceptance, sustained play, the final card language and whole-product visual judgement remain separate finish lines.

Production verified in the reportRead status
2026-10-07

max: Software prototype · physical proof open

The software platform is substantial, but the report records no new delivery in this period. Finding the real walker, mounted hardware and voice behaviour remain physical questions.

Next proof: Demonstrate FIND with a real walker and person, then complete provider and production rollout with measured operating assumptions.

Software prototype · physical proof openRead status
2026-10-07

pirates: Source parity before expansion

The source-backed reconstruction remains the governing boundary. This review records no new product movement; the procedural fork still depends on the parity gate.

Next proof: Complete source-backed parity and reconcile stale operating instructions without weakening the reconstruction boundary.

Source parity before expansionRead status
2026-10-07

loftwahfm: Listener built · delivery paused

The listener platform has useful playback and publishing capability. The supplied report records no new movement in this review period; queue, Now Playing, archive discovery and release-page work remain open.

Next proof: Resume the listening journey and business demonstration, separate preview media from production, and refresh release evidence.

Listener built · delivery pausedRead status
2026-10-07

social-club: Hospitality prototype · delivery paused

The report records no new product movement. The hospitality product has an established software direction, with the remaining outcome waiting on product execution rather than a congested review queue.

Next proof: Resume the core hospitality journey and obtain fresh product, operator and deployment evidence before making readiness claims.

Hospitality prototype · delivery pausedRead status
2026-10-07

asset-hunter: Live product · broader discovery

Local folders are now a first-class source alongside GitHub. Byte inspection, intent-first discovery, portable packs and backup-and-restore work have landed. The report records an exact production verification for an earlier release; newer source work is ahead of that receipt.

Next proof: Prove the newer source in production, expand useful handlers and discovery, and observe outside builders completing real hunts.

Live product · broader discoveryRead status