What this record says
On 5 October 2026 the public site reported commit 9ee8a75 as its build, its version endpoint answered with that same commit and a clean tree, and the published wall read 40 possibilities. The recent commit history added discovery modes, engine inspection of the bytes it downloads, a reader-side rating withdrawal, a share-card brand-freshness check and a backup-and-restore drill — a product verifying its own operation rather than adding surface.
The next useful proof
The next proof is not another mechanism. It is external: whether outside builders or agents complete a real hunt, use what they find and return for another. Until a rating, a rights report or a dispute exists, the tables that would record a person's judgement are empty.
Where the proof stops
A dated observation of one public repository and one public origin on one day. It does not establish external demand, and the absence of recorded use is the finding rather than a gap in the record. It says nothing about the catalogue after 5 October 2026.
Read the Asset Hunter project dossier · Read the reviewed snapshot